Kaylor Park Drive Extension to HHS2

  • Increase
  • Normal
  • Decrease

Current Size: 80%

The project extends East Kaylor Park Drive to the site of Harrisonburg’s second high school and connects to S. Main Street south of Pointe Drive. The project will install a signal at the South Main Street and East Kaylor Park intersection and create a right-in, right-out intersection at the new connection to South Main Street. A shared-use path will be constructed along the road through the high school site, with a sidewalk or shared-use path connections to South Main Street.

Project Schedule:

Preliminary Engineering – 2021-22

Right-of-way acquisition and utility relocation – 2021-22

Construction – 2023