Gay Street Reconfiguration Project
This project proposes revising the configuration to improve operations and safety for people driving, biking, and walking on a segment of Gay Street.
This project proposes revising the configuration to improve operations and safety for people driving, biking, and walking on a segment of Gay Street.
Northend Greenway Brookside Phase project plans include constructing a 10-foot-wide asphalt path between Roberts Court and the existing path at Jefferson Street, with a connection to Drake Lane. This path will create a safer and more continuous route for people walking and biking in this neighborhood and add to the overall 2.5 mile Northend Greenway Project.
Sidewalk will be constructed on the south side of Country Club Road between Linda Lane and Spotswood Homes mobile home park.
Harrisonburg Public Works will host an open house at the Simms Center where the public may learn more and ask questions about roadway reconfiguration projects and learn specific details about projects proposed for summer 2023.
The project extends East Kaylor Park Drive to the site of Harrisonburg’s second high school and connects to S. Main Street south of Pointe Drive.
Projects for multiple improvements to South Main Street in the vicinity of the I-81 Exit 243 interchange to Mosby Road.
The project adds a 3' wide concrete median on S. Main Street from just south of Mosby Rd to Stone Spring Rd/Erickson Ave, with a break to maintain a full access entrance to Dukes Plaza.
This project addresses multiple safety concerns on the Port Republic Road corridor between Hunters Rd and Devon Lane, as identified in the Port Republic Road Safety and Operations Study
This project extends the eastbound Port Republic Road left turn lane at Bluestone Drive from 100' of storage for vehicles to 300'.
The project realigns University Blvd between the old convocation center parking lot and Forest Hill Road at the Oak Hill Drive intersection.