Additions to Fire Stations #2 & #3 ITB

 

ITB/RFP Number: 2023006-FD-B
ITB/RFP Title: Additions to Fire Stations #2 & #3 ITB 
Contact: Mr. Shane B. Smith, Procurement Manager
Questions@harrisonburgva.gov

 


 

Description:

A sprinkler room addition is being constructed at each of the 2 fire stations listed for the purpose of adding sprinklers to each of the 2 fire stations in accordance with NFPA 13. Sprinkler risers are to be installed in these rooms, and sprinkler lines will then be run at ceiling level throughout each building. Dry sprinklers will be installed in the attic space of each building. This project is being partially funded with a federal grant.

Construction must be complete, and all payment applications processed, prior to March 31, 2023.

Both fire stations must remain fully operational at all times, and ingress and egress of fire apparatus may not be impeded at any time. Additionally, fire trucks must be able to be parked inside the building at night, but may be moved outside during the day if necessary.

The addresses for each Station are as follows:

HFD Station 2

380 Pleasant Valley Road

Harrisonburg, VA 22801

HFD Station 3

299 Lucy Drive

Harrisonburg, VA 22801

 

Publication Date:
July 29, 2022 
Closing Date/Time:
August 31, 2022
Pre-Bid/Pre-Proposal Meeting Date/Time:

August 18, 2022 at 10:00am local time

Harrisonburg City Hall, 409 S. Main St., Room 011, Harrisonburg, VA 22801 

Questions:
All questions must be received no later than August 24, 2022 at 12:00pm (noon) local time
Submittal Information:

Purchasing Office, 409 South Main Street, Third Floor, Harrisonburg, VA 22801

*Any bids/proposals received after the closing date and time will not be accepted.

Bid/Proposal Opening Information:
Purchasing Office, 409 South Main Street, Room 011, Harrisonburg, VA 22801
Special Requirements & Highlights:
See ITB 
ITB/RFP Documents & Attachments:

PDF[12MB] Additions to Fire Stations #2 & #3 ITB

PDF[2MB] Additions to Fire Stations #2 & #2 PLANS

Addenda:

PDF[103KB] Addendum #1 (08-09-22)

PDF[15MB] Addendum #2 (08-22-22)

PDF[715KB] Addendum #3 (08-24-22)

Award:
PDF[88KB] Notice of Award (09-08-22)