Bids

Proposed Bridge Substructure Repair ITB (Proposed Bridge Substructure Repair for Martin Luther King, Jr. Way over Blacks Run, NS Railway & Chesapeake Ave.)

The City of Harrisonburg will accept sealed bids/proposals for the Proposed Bridge Substructure Repair ITB up until February 16, 2022 on or before 3:00pm local time.

Pages